Deliverable Setups: Difference between revisions
No edit summary |
|||
| (14 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
__NOTOC__ | |||
<!-- ===================== HEADER ===================== --> | |||
<div style="margin:0 0 15px 0; padding:18px 22px; border:1px solid rgba(128,128,128,0.35); border-left:5px solid #3366cc; border-radius:6px; background:rgba(51,102,204,0.06);"> | |||
<div style="font-size:170%; font-weight:bold; margin-bottom:4px;">Deliverable Setup Methodologies</div> | |||
<div style="font-size:100%; margin-bottom:8px;">Standardized configuration workflows for grid-aligned, flange-aligned, and clash-sensitive deliverable setups in automet® FAB.</div> | |||
<div style="font-size:90%;">[[Main Page|← Main Page]] · [[Automet® FAB - Analysis|← Analysis]]</div> | |||
</div> | |||
== Pre-Survey Considerations == | |||
Numerous methods exist for establishing an automet® FAB deliverable depending on spool geometry and site environmental constraints. Prior to survey execution, field surveyors must verify: | |||
* '''Obstructions and interference:''' Presence and precise coordinates of unremovable objects adjacent to the pipe run. | |||
* '''Structural steelwork:''' Locations of existing structural members intended for pipe support attachment. | |||
* '''Tie-in flange parameters:''' Gasket/offset thickness, pressure rating, and total bolt-hole count. | |||
* '''Tie-in condition:''' Whether the tie-in point is open (unconnected/no blind flange) or fixed. | |||
== | === Primary deliverable setup configurations === | ||
# '''Grid system setup:''' Aligns deliverable geometry directly with overall site/platform grid coordinates. | |||
# '''Flange alignment setup:''' Prioritizes minimum flange misalignment regardless of global grid rotation. | |||
# '''Potential clash setup:''' Maintains specific centerline workpoints (circle fit) to avoid nearby obstructions. | |||
< | <div style="clear:both;"></div> | ||
</ | |||
== Method 1: Deliverable Setup in Accordance with Grid System == | |||
Grid system setup is frequently utilized when establishing entirely new pipe routes, following existing structural steelwork, or managing complex multi-spool runs. | |||
<table style="width:100%; border-collapse:separate; border-spacing:16px; margin:16px 0;"> | |||
<tr> | |||
<td style="width:50%; vertical-align:top; background:#ffffff; border:1px solid rgba(128,128,128,0.25); border-radius:6px; padding:14px; text-align:center;"> | |||
[[File:KB 303a.png|center|450px]] | |||
<div style="margin-top:8px; font-weight:bold; font-size:90%; color:#333;">Grid-aligned deliverable overview</div> | |||
</td> | |||
<td style="width:50%; vertical-align:top; background:#ffffff; border:1px solid rgba(128,128,128,0.25); border-radius:6px; padding:14px; text-align:center;"> | |||
[[File:KB 304a.png|center|600px]] | |||
<div style="margin-top:8px; font-weight:bold; font-size:90%; color:#333;">Analysis transform configuration for grid alignment</div> | |||
</td> | |||
</tr> | |||
</table> | |||
=== Key considerations === | |||
* Surrounding physical reference points (decks, bulkheads, structural steel) are used to build the local analysis grid via the **analysis transform** function. | |||
* The physical orientation of spools within the surrounding environment forms an integral part of the deliverable output. | |||
* While necessary for routing along structural steel, this method can make complex spool geometry harder to interpret on fabrication drawings. | |||
<div style="clear:both;"></div> | |||
== Method 2: Deliverable Setup in Accordance with Flange Alignment == | |||
This approach disregards overall grid orientation to prevent in-situ structural misalignment from corrupting shop fabrication dimensions. | |||
This | |||
< | <table style="width:100%; border-collapse:separate; border-spacing:16px; margin:16px 0;"> | ||
File:KB 305.png | <tr> | ||
</ | <td style="width:50%; vertical-align:top; background:#ffffff; border:1px solid rgba(128,128,128,0.25); border-radius:6px; padding:14px; text-align:center;"> | ||
[[File:KB 305.png|center|450px]] | |||
<div style="margin-top:8px; font-weight:bold; font-size:90%; color:#333;">Flange-aligned deliverable overview</div> | |||
</td> | |||
<td style="width:50%; vertical-align:top; background:#ffffff; border:1px solid rgba(128,128,128,0.25); border-radius:6px; padding:14px; text-align:center;"> | |||
[[File:KB 306a.png|center|550px]] | |||
<div style="margin-top:8px; font-weight:bold; font-size:90%; color:#333;">Analysis transform configuration for flange alignment</div> | |||
</td> | |||
</tr> | |||
</table> | |||
=== Operational benefits === | |||
* '''Improved baseline accuracy:''' If preliminary design dimensions contain errors, alignment fit preferences produce cleaner outcomes, allowing easy preliminary file adjustments. | |||
* '''Decoupled survey data:''' Grid misalignment does not distort spool fabrication dimensions; the report strictly details physical spool geometry. | |||
* '''Simplified shop build:''' Produces clearer, highly fabrication-friendly spool isometric drawings. | |||
< | <div style="clear:both;"></div> | ||
</ | |||
== Method 3: Deliverable Setup for Potential Clash Conditions == | |||
When an object or support sits close to an existing pipe run, a **circle-fit** calculation must be performed to ensure the new deliverable routes through the exact spatial position of the original spool centerline. | |||
=== 1. Identifying and configuring the circle fit === | |||
Field survey notes must explicitly specify that the circle-fit center point is to be maintained during deliverable creation. | |||
<table style="width:100%; border-collapse:separate; border-spacing:16px; margin:16px 0;"> | |||
<tr> | |||
<td style="width:50%; vertical-align:top; background:#ffffff; border:1px solid rgba(128,128,128,0.25); border-radius:6px; padding:14px; text-align:center;"> | |||
[[File:KB 307.png|center|400px]] | |||
<div style="margin-top:8px; font-weight:bold; font-size:90%; color:#333;">Circle fit location on physical spool</div> | |||
</td> | |||
<td style="width:50%; vertical-align:top; background:#ffffff; border:1px solid rgba(128,128,128,0.25); border-radius:6px; padding:14px; text-align:center;"> | |||
[[File:KB 308.png|center|800px]] | |||
<div style="margin-top:8px; font-weight:bold; font-size:90%; color:#333;">Circle fit execution within analysis module</div> | |||
</td> | |||
</tr> | |||
</table> | |||
=== 2. Analysis fit procedure === | |||
1. Set all flange fit preferences to **alignment**. | |||
2. Uncheck the circle-fit option during initial setup and zero **Flange 01**. | |||
3. Rotate flanges taking Flange 01 as the origin until **Flange 02** reaches zero Z elevation. | |||
<table style="width:100%; border-collapse:separate; border-spacing:16px; margin:16px 0;"> | |||
<tr> | |||
<td style="width:50%; vertical-align:top; background:#ffffff; border:1px solid rgba(128,128,128,0.25); border-radius:6px; padding:14px; text-align:center;"> | |||
[[File:KB 309.png|center|600px]] | |||
<div style="margin-top:8px; font-weight:bold; font-size:90%; color:#333;">Initial flange fit alignment preferences</div> | |||
</td> | |||
<td style="width:50%; vertical-align:top; background:#ffffff; border:1px solid rgba(128,128,128,0.25); border-radius:6px; padding:14px; text-align:center;"> | |||
[[File:KB 310.png|center|600px]] | |||
<div style="margin-top:8px; font-weight:bold; font-size:90%; color:#333;">Zero-Z rotation on secondary flange</div> | |||
</td> | |||
</tr> | |||
</table> | |||
=== 3. Text report generation and cross-check === | |||
Print the text report from the main menu and construct the deliverable while maintaining the identical X coordinate for the circle-fit center. | |||
<table style="width:100%; border-collapse:separate; border-spacing:16px; margin:16px 0;"> | |||
<tr> | |||
<td style="width:50%; vertical-align:top; background:#ffffff; border:1px solid rgba(128,128,128,0.25); border-radius:6px; padding:14px; text-align:center;"> | |||
[[File:KB 311a.png|center|400px]] | |||
<div style="margin-top:8px; font-weight:bold; font-size:90%; color:#333;">Survey text report output</div> | |||
</td> | |||
<td style="width:50%; vertical-align:top; background:#ffffff; border:1px solid rgba(128,128,128,0.25); border-radius:6px; padding:14px; text-align:center;"> | |||
[[File:KB 312.png|center|600px]] | |||
<div style="margin-top:8px; font-weight:bold; font-size:90%; color:#333;">Deliverable dimensional edits</div> | |||
</td> | |||
</tr> | |||
<tr> | |||
<td style="width:50%; vertical-align:top; background:#ffffff; border:1px solid rgba(128,128,128,0.25); border-radius:6px; padding:14px; text-align:center;"> | |||
[[File:KB 313.png|center|600px]] | |||
<div style="margin-top:8px; font-weight:bold; font-size:90%; color:#333;">Cross-check verification mode</div> | |||
</td> | |||
<td style="width:50%; vertical-align:top; background:#ffffff; border:1px solid rgba(128,128,128,0.25); border-radius:6px; padding:14px; text-align:center;"> | |||
[[File:KB 314.png|center|700px]] | |||
<div style="margin-top:8px; font-weight:bold; font-size:90%; color:#333;">Finalized cross-check validation</div> | |||
</td> | |||
</tr> | |||
</table> | |||
=== 4. Potential clash risk === | |||
Failing to maintain circle-fit centers during deliverable creation can result in severe physical clashes at fitting locations during installation: | |||
< | <div style="text-align:center; margin:16px auto 24px auto;"> | ||
File:KB 315.png| | [[File:KB 315.png|center|800px]] | ||
</ | <div style="margin-top:6px; font-size:85%; font-weight:bold; color:#cc0000;">Example of a physical clash at the elbow due to omitted circle-fit constraints</div> | ||
</div> | |||
Latest revision as of 08:14, 13 October 2026
Pre-Survey Considerations
Numerous methods exist for establishing an automet® FAB deliverable depending on spool geometry and site environmental constraints. Prior to survey execution, field surveyors must verify:
- Obstructions and interference: Presence and precise coordinates of unremovable objects adjacent to the pipe run.
- Structural steelwork: Locations of existing structural members intended for pipe support attachment.
- Tie-in flange parameters: Gasket/offset thickness, pressure rating, and total bolt-hole count.
- Tie-in condition: Whether the tie-in point is open (unconnected/no blind flange) or fixed.
Primary deliverable setup configurations
- Grid system setup: Aligns deliverable geometry directly with overall site/platform grid coordinates.
- Flange alignment setup: Prioritizes minimum flange misalignment regardless of global grid rotation.
- Potential clash setup: Maintains specific centerline workpoints (circle fit) to avoid nearby obstructions.
Method 1: Deliverable Setup in Accordance with Grid System
Grid system setup is frequently utilized when establishing entirely new pipe routes, following existing structural steelwork, or managing complex multi-spool runs.
|
Grid-aligned deliverable overview
|
Analysis transform configuration for grid alignment
|
Key considerations
- Surrounding physical reference points (decks, bulkheads, structural steel) are used to build the local analysis grid via the **analysis transform** function.
- The physical orientation of spools within the surrounding environment forms an integral part of the deliverable output.
- While necessary for routing along structural steel, this method can make complex spool geometry harder to interpret on fabrication drawings.
Method 2: Deliverable Setup in Accordance with Flange Alignment
This approach disregards overall grid orientation to prevent in-situ structural misalignment from corrupting shop fabrication dimensions.
|
Flange-aligned deliverable overview
|
Analysis transform configuration for flange alignment
|
Operational benefits
- Improved baseline accuracy: If preliminary design dimensions contain errors, alignment fit preferences produce cleaner outcomes, allowing easy preliminary file adjustments.
- Decoupled survey data: Grid misalignment does not distort spool fabrication dimensions; the report strictly details physical spool geometry.
- Simplified shop build: Produces clearer, highly fabrication-friendly spool isometric drawings.
Method 3: Deliverable Setup for Potential Clash Conditions
When an object or support sits close to an existing pipe run, a **circle-fit** calculation must be performed to ensure the new deliverable routes through the exact spatial position of the original spool centerline.
1. Identifying and configuring the circle fit
Field survey notes must explicitly specify that the circle-fit center point is to be maintained during deliverable creation.
|
Circle fit location on physical spool
|
Circle fit execution within analysis module
|
2. Analysis fit procedure
1. Set all flange fit preferences to **alignment**. 2. Uncheck the circle-fit option during initial setup and zero **Flange 01**. 3. Rotate flanges taking Flange 01 as the origin until **Flange 02** reaches zero Z elevation.
|
Initial flange fit alignment preferences
|
Zero-Z rotation on secondary flange
|
3. Text report generation and cross-check
Print the text report from the main menu and construct the deliverable while maintaining the identical X coordinate for the circle-fit center.
|
Survey text report output
|
Deliverable dimensional edits
|
|
Cross-check verification mode
|
Finalized cross-check validation
|
4. Potential clash risk
Failing to maintain circle-fit centers during deliverable creation can result in severe physical clashes at fitting locations during installation:












