Fabricators: Difference between revisions

From ML Tech Wiki
Jump to navigation Jump to search
No edit summary
 
(38 intermediate revisions by 2 users not shown)
Line 1: Line 1:
=Setup=
__NOTOC__
You need to turn on the Total Station and connect to your laptop. If you are not sure how to do this, head [https://www.youtube.com/watch?v=ajIbQ0lo2gY&t=6s| here.]
<!-- ===================== HERO BANNER ===================== -->
<div style="margin:0 0 20px 0; padding:18px 22px; border:1px solid rgba(128,128,128,0.35); border-left:5px solid #3366cc; border-radius:6px; background:rgba(51,102,204,0.06);">
<div style="font-size:170%; font-weight:bold; margin-bottom:4px;">automet® for Fabricators</div>
<div style="margin-bottom:8px;">Three core steps: Design Input, Field/Shop Survey, and Analysis. Follow this workflow in order to inspect, verify, and correct pipe spools during fabrication.</div>
<div style="font-size:90%;">[[Main Page|← Return to Main Page]]</div>
</div>


=Process=
<!-- ===================== PROCESS AT A GLANCE ===================== -->
As a fabricator, you have a 3-step process for using automet successfully: Design input - Survey - Analysis.
<div style="display:flex; flex-wrap:wrap; gap:14px; margin:0 0 20px 0;">
<div style="flex:1 1 200px; padding:14px 18px; border:1px solid rgba(128,128,128,0.35); border-top:4px solid #00af89; border-radius:6px; background:#fafafa;">
'''1 · [[#Step 1: Design Input|Design Input]]'''<br>Import or manually construct the baseline spool model (.DES).
</div>
<div style="flex:1 1 200px; padding:14px 18px; border:1px solid rgba(128,128,128,0.35); border-top:4px solid #e67e22; border-radius:6px; background:#fafafa;">
'''2 · [[#Step 2: Survey Execution|Survey Execution]]'''<br>Observe physical flanges, supports, and pipe ends against the design.
</div>
<div style="flex:1 1 200px; padding:14px 18px; border:1px solid rgba(128,128,128,0.35); border-top:4px solid #9b59b6; border-radius:6px; background:#fafafa;">
'''3 · [[#Step 3: Analysis and Deviation Verification|Analysis & Report]]'''<br>Evaluate vector deviations, alignment touch points, and export reports.
</div>
</div>


=Step 1: Design Input=
<!-- ===================== PRE-FLIGHT SETUP ===================== -->
Automet requires a design to survey against. There are two ways to do this in automet.
<div style="padding:14px 18px; margin:0 0 24px 0; border:1px solid rgba(128,128,128,0.35); border-left:5px solid #3366cc; border-radius:6px; background:rgba(51,102,204,0.04);">
<div style="font-weight:bold; font-size:105%; margin-bottom:4px;">Before starting the survey:</div>
Power on the Total Station and establish a connection to your laptop via Bluetooth or Leica GEV267 serial cable.
<br><br>
<b>Video guide:</b> [https://www.youtube.com/watch?v=ajIbQ0lo2gY Getting Started & Hardware Setup]
</div>


===Design Input Method 1===
== Step 1: Design Input ==
The quickest and easiest way to get a design into automet, is to upload an IDF or PCF file of your spool straight into the system.


If you do this, automet will create the design input file (.DES) using all the data in the file and you can survey straight away.
automet® FAB '''requires a baseline design file (`.DES`)''' to compare measured survey points against drawing specifications.


Most plant design systems can export this file type. For a video on this process, go [https://www.youtube.com/watch?v=mThSe3I5A5o&t=1s| here].
<div style="display:flex; flex-wrap:wrap; gap:16px; margin:14px 0 20px 0;">
<div style="flex:1 1 320px; padding:16px 20px; border:1px solid rgba(128,128,128,0.35); border-top:4px solid #00af89; border-radius:6px; background:#ffffff;">
<div style="font-size:115%; font-weight:bold; margin-bottom:8px; color:#007a60;">Method 1 · Import IDF or PCF File</div>
The fastest method. Import an exported plant design file (IDF or PCF) directly into automet® FAB. The system automatically populates component specifications, flange ratings, and segment lengths into a `.DES` file.


===Design Input Method 2===
<br>
You can also enter designs manually, by using the design input module of the software. You should learn how to do this, regardless of the availability of IDF and PCF files. You will need to edit design files at some point, so make sure you know how to do this by using the Wiki and YouTube or through direct training from MLTech. A full playlist of how to create designs is located [https://www.youtube.com/watch?v=_oud6TeDFw0&list=PLfbSUslPQTHGocyxyWQTL0576i1GrYIyP&index=1| here].
<b>Video guide:</b> [https://www.youtube.com/watch?v=mThSe3I5A5o Import IDF/PCF Files into automet®]
</div>


====Off-Grid Mitres====
<div style="flex:1 1 320px; padding:16px 20px; border:1px solid rgba(128,128,128,0.35); border-top:4px solid #00af89; border-radius:6px; background:#ffffff;">
If you have an off-grid spool which also has a deflection, check on the drawing for how the deflection is oriented. You should see something along the lines of: ALL FLANGE DEFLECTIONS ARE SHOWN SQUARE TO THE GRID. In this case, follow the instructions on the video [https://www.youtube.com/watch?v=zv_mghSPPm0&list=PLfbSUslPQTHGocyxyWQTL0576i1GrYIyP&index=10| here].
<div style="font-size:115%; font-weight:bold; margin-bottom:8px; color:#007a60;">Method 2 · Manual Design Entry</div>
Build or edit the model manually using the Design Input module. Mastering manual entry is essential for updating client isometric drawings, editing gasket allowances, and modifying component lengths in the field.


This is a good idea as it breaks up a lot of text into a more readable, structured format. You can be 100% confident in the code below; it uses standard MediaWiki table syntax and inline CSS to ensure the table is centred on the page and the text is easy to read.
<br>
<b>Video guide:</b> [https://www.youtube.com/watch?v=_oud6TeDFw0&list=PLfbSUslPQTHGocyxyWQTL0576i1GrYIyP&index=1 Manual Design Entry Video Playlist]
</div>
</div>


I have formatted this into a 2x2 grid. Since you have three distinct sections of content, I have placed the third section (Off-Grid Mitres) in the bottom-left cell, leaving the bottom-right cell for any future additions or a summary.
== Step 2: Survey Execution ==


Wikimedia Table Code
Once a design model (`.DES`) is loaded, you are ready to execute the survey.
Code snippet
{| class="wikitable" style="margin-left: auto; margin-right: auto; width: 90%;"
|-
! style="width: 50%; background-color: #f2f2f2;" | === Design Input Method 1 ===
! style="width: 50%; background-color: #f2f2f2;" | === Design Input Method 2 ===
|-
| valign="top" |
The quickest and easiest way to get a design into automet is to upload an IDF or PCF file of your spool straight into the system.


If you do this, automet will create the design input file (.DES) using all the data in the file and you can survey straight away.
=== Starting a survey session ===
Select the '''Run Survey''' button on the main menu.


Most plant design systems can export this file type. For a video on this process, go [https://www.youtube.com/watch?v=mThSe3I5A5o&t=1s here].
<gallery mode="packed" heights="250px">
| valign="top" |  
File:Survey Main Menu - Run Survey.png|automet® main menu: Select Run Survey
You can also enter designs manually by using the design input module of the software. You should learn how to do this, regardless of the availability of IDF and PCF files.
</gallery>


You will need to edit design files at some point, so make sure you know how to do this by using the Wiki and YouTube or through direct training from MLTech. A full playlist of how to create designs is located [https://www.youtube.com/watch?v=_oud6TeDFw0&list=PLfbSUslPQTHGocyxyWQTL0576i1GrYIyP&index=1 here].
<div style="display:flex; flex-wrap:wrap; gap:16px; margin:16px 0 20px 0;">
|-
<div style="flex:1 1 320px; padding:16px 20px; border:1px solid rgba(128,128,128,0.35); border-top:4px solid #e67e22; border-radius:6px; background:#ffffff;">
! style="background-color: #f2f2f2;" | ==== Off-Grid Mitres ====
<div style="font-size:115%; font-weight:bold; margin-bottom:8px; color:#c0392b;">Start New Survey</div>
! style="background-color: #f2f2f2;" |
Select '''START NEW''' to generate a new survey file using the design name, automatically assigning the survey stage and revision number.
|-
| valign="top" |
If you have an off-grid spool which also has a deflection, check on the drawing for how the deflection is oriented.  


You should see something along the lines of: ALL FLANGE DEFLECTIONS ARE SHOWN SQUARE TO THE GRID. In this case, follow the instructions on the video [https://www.youtube.com/watch?v=zv_mghSPPm0&list=PLfbSUslPQTHGocyxyWQTL0576i1GrYIyP&index=10 here].
<gallery mode="packed" heights="200px">
| valign="top" |  
File:KB 117.png|Start New survey setup dialog
''(Intentionally left blank for layout)''
</gallery>
|}
</div>


=Step 2: Survey=
<div style="flex:1 1 320px; padding:16px 20px; border:1px solid rgba(128,128,128,0.35); border-top:4px solid #e67e22; border-radius:6px; background:#ffffff;">
Once you have a design in the system, you're ready to survey.
<div style="font-size:115%; font-weight:bold; margin-bottom:8px; color:#c0392b;">Continue Existing Survey</div>
Select '''CONTINUE EXISTING''' to reload previous observations. This function requires that neither the spool nor total station has moved, or that control points are available for resection.


==Start the Survey==
<gallery mode="packed" heights="200px">
Start a survey by clicking the '''Run Survey''' button.
File:KB 118.png|Continue Existing survey dialog
</gallery>
</div>
</div>


[[File:Survey Main Menu - Run Survey.png|600 px|automet® FAB - Survey > Run Survey]]
=== Load design file and survey stage ===
1. Select the target design file using the file browser button (`...`).
2. Choose the appropriate survey stage:
#* '''In-Situ:''' Field measurements on installed piping networks prior to replacement.
#* '''Tack Weld:''' Fabrication shop survey during pre-weld assembly.
#* '''Post Weld:''' Final quality verification following full weld completion.


Survey Type: START NEW or CONTINUE EXISTING
<gallery mode="packed" heights="75px">
File:design file select.png|Design file selection dialog
File:survey stage postweld.png|Selecting survey stage (Post Weld)
</gallery>


===Start New===
=== Pre-survey preparation checklist ===
When you click the '''START NEW''' button, a survey file with the same name as the design file will be generated that includes the survey stage and revision.
Before selecting '''Start Capture''':


[[File:KB 117.png|600 px]]
1. '''Verify isometric geometry:''' Click the '''Isometric''' button to confirm the active model matches the physical spool. Flange numbers on the drawing must correspond directly to survey sequence order.
2. '''Physical flange marking:''' Mark corresponding flange numbers directly onto physical flanges using paint markers.
3. '''Targeting telescope start point:''' Aim the telescope at a accessible starting point on Flange 01. Hold the right mouse button to guide the motor laser. If target lock is lost, return the prism to the starting point to recover lock.
4. '''Plan measurement path:''' Select an initial diameter point and proceed sequentially around the flange face in one continuous direction.


===Continue Existing===
<gallery mode="packed" heights="500px">
If a survey is not completed or needs to be continued, the '''CONTINUE EXISITING''' option can be used to reload all the observations. For this to be a valid option, the spool and instrument '''must not have moved''' or the file must have control points, that can be remeasured.
File:Iso of Spool 6.png|Isometric spool review window
 
</gallery>
[[File:KB 118.png|600 px]]
 
==Load Design File==
Select a design file for the survey using the three dots.
 
[[File:design file select.png|700 px|]]
 
==Survey Stage==
*The '''In-Situ Survey Stage''' can be used for any survey not performed in the pipe fabrication shop.
*The '''Tack Weld Survey Stage''' can be used for any pipe spool survey that is performed during fabrication at the pre-weld stage.
*The '''Post Weld Survey Stage''' can be used for any pipe spool survey that is performed after fabrication.
 
[[File:survey stage postweld.png|700 px|]]
 
==Preparing to Survey==
Below are some preparatory steps to take before selecting the '''Start Capture''' button.
 
* Select the '''Isometric''' button to review the spool's isometric view. This allows you to verify that the file loaded is the correct pipe spool. The order of observations can be customised, however  the flange numbers must match the isometric, otherwise there will be calculation mistakes where the distinction between design and survey flanges has been lost.
* Point the instrument telescope towards a '''good starting point'''. This is a point that is easy to get to. Activate the laser by holding down the right mouse button and moving the mouse to guide the instrument telescope. If the prism lock is lost, you can recover the lock by putting your prism back at the start point and facing the laser.
 
Click here to see a video on the '''start point''':
<imagemap>
File:YT Start Point.png|300px|Click the image to watch the video.
desc none
rect 0 0 1920 1080 [https://youtu.be/ajIbQ0lo2gY]
</imagemap>
 
* It is a good idea to '''mark the flange numbers''' on the physical flanges.
* Be organised by examining each flange to select where you will begin measuring. Do not begin in the middle of the potential locations around the circumference. Instead, begin at one end and work your way around in one direction. Try to '''plan where you will move from and to before you start'''.
 
[[File:Iso of Spool 6.png|600 px]]


==Survey==
<div style="margin:16px 0; padding:14px 18px; border:1px solid rgba(128,128,128,0.3); border-left:4px solid #e67e22; border-radius:4px; background:rgba(230,126,34,0.04);">
This video shows how a spool flange is measured using the automet® FAB system and provides details of the general spool flange survey process.
<div style="font-weight:bold; font-size:105%; margin-bottom:4px; color:#333;">Moving survey start points</div>
<b>Video guide:</b> [https://youtu.be/mVikoFuiKu8 Moving the Start Point During a Survey] (0:55)
<br><br>
<i>Summary:</i> Useful technique when surveying large spools with restricted line-of-sight.
</div>


<imagemap>
=== Orientation Point (OP) for straight spools ===
File:Fab Survey.jpg|300px|Click the image to watch the video.
An '''Orientation Point (OP)''' establishes Top Dead Centre (TDC) for straight pipe spools lacking distinguishing geometric features.
desc none
rect 0 0 1920 1080 [https://www.youtube.com/watch?v=-EP23_tt0WI]
</imagemap>


==Surveying supports==
1. Record a single point at the top center of Flange 01, positioned at Top Dead Centre between the upper bolt holes.
See this [https://youtu.be/bL57blkcubM| video] to review how supports are surveyed within automet.
2. Proceed with the flange survey as normal.
3. Mark the physical OP location on the spool body to ensure correct site installation orientation.


==Orientation Points==
<div style="margin:16px 0; padding:14px 18px; border:1px solid rgba(128,128,128,0.3); border-left:4px solid #e67e22; border-radius:4px; background:rgba(230,126,34,0.04);">
The '''orientation point (OP)''' indicates the top dead centre (TDC) of a straight pipe spools in the '''as installed orientation'''.
<div style="font-weight:bold; font-size:105%; margin-bottom:4px; color:#333;">Orientation Point workflow</div>
<b>Video guide:</b> [https://youtu.be/BmtSAx5Joms Orientation Point Procedure for Straight Spools] (2:56)
</div>


You must measure an OP point on any straight spool - this allows the system to know which way the spool should be oriented. This is important when there are flange deflections, and the orientation is crucial to the installation.
=== Flange and support observations ===
<div style="margin:16px 0; padding:14px 18px; border:1px solid rgba(128,128,128,0.3); border-left:4px solid #e67e22; border-radius:4px; background:rgba(230,126,34,0.04);">
<b>Video guides:</b>
* [https://www.youtube.com/watch?v=-EP23_tt0WI Spool Flange Survey Procedure] (3:28)
* [https://youtu.be/bL57blkcubM Surveying Structural Supports and Base Plates] (2:23)
</div>


The system will ask for this point first.
== Step 3: Analysis and Deviation Verification ==


Take a single point on top of flange 01 at the TDC point between the top two bolt holes; then you can carry on with your survey as normal.
The analysis module compares captured survey coordinates against design geometry to calculate dimensional deviations.


Regardless of spool orientation during the survey, the pipe spool will be orientated on the final report with the orientation point at the top, or north if the spool is vertical. If the pipe centre line is vertical in the design file, then the orientation point will be set north.
<div style="padding:16px 20px; margin:16px 0 20px 0; border:1px solid rgba(128,128,128,0.35); border-top:4px solid #9b59b6; border-radius:6px; background:#ffffff;">
<div style="font-size:115%; font-weight:bold; margin-bottom:8px; color:#8e44ad;">Key Analytical Definitions</div>
* '''Vector error:''' Coordinate distance (X, Y, Z) between measured work points and design centerlines.
* '''Alignment error (Touch Point):''' High-point location on a flange face that will make contact first with a mating flange. The displayed value represents the gap opening (in mm) on the opposite side of the face.
* '''Rotational error:''' Angular rotation error of bolt-hole patterns relative to design reference axes.
</div>


A video showing this process can be found here:
=== Interpreting deviation reports ===


<imagemap>
<!-- ===================== 2 x 2 GRID ===================== -->
File:YT OP.jpg|300px|Click the image to watch the video.
<div style="display:flex; flex-wrap:wrap; gap:16px; margin:16px 0 20px 0;">
desc none
rect 0 0 1920 1080 [https://youtu.be/BmtSAx5Joms]
</imagemap>


To make sure everything is installed correctly on site, mark the OP point on the spool itself.
<!-- ROW 1 -->
<div style="flex:1 1 45%; min-width:300px; padding:16px 20px; border:1px solid rgba(128,128,128,0.35); border-top:4px solid #9b59b6; border-radius:6px; background:#ffffff; text-align:center;">
<div style="font-weight:bold; margin-bottom:8px; color:#8e44ad;">Positional Vector Errors</div>
<div style="margin-bottom:10px; text-align:left;">Vector arrows indicate the magnitude and direction of displacement.
<br><br>
<i>Example:</i> A flange reading +1.4 mm Z, +0.6 mm Y (North), and +0.8 mm X (East) requires physical adjustment in the opposite direction (-1.4 mm Z, -0.6 mm South, -0.8 mm West) to achieve zero deviation.</div>
[[File:PDF Link VEGR 01.png|center|300px]]
</div>


=Step 3: Analysis=
<div style="flex:1 1 45%; min-width:300px; padding:16px 20px; border:1px solid rgba(128,128,128,0.35); border-top:4px solid #9b59b6; border-radius:6px; background:#ffffff; text-align:center;">
==Overview==
<div style="font-weight:bold; margin-bottom:8px; color:#8e44ad;">Bolt-Hole Rotational Error</div>
The analysis section has been designed to allow the user to review and compare '''captured survey data''' against the '''design data'''.
<div style="margin-bottom:10px; text-align:left;">The blue curved arrow indicates rotational displacement (in mm or degrees) and direction of bolt-hole misalignment.</div>
[[File:PDF Link VEGR 03.png|center|300px]]
</div>


automet® terms:
<!-- ROW 2 -->
*'''Vector error''' is the difference between a measured work point and the design coordinates.
<div style="flex:1 1 45%; min-width:300px; padding:16px 20px; border:1px solid rgba(128,128,128,0.35); border-top:4px solid #9b59b6; border-radius:6px; background:#ffffff; text-align:center;">
*'''Alignment error'''. The touch point is the point on the flange face that will come into contact with the adjoining flange if a flange is not aligned as intended. The value displayed represents the gap in millimetres opposite the touch point.
<div style="font-weight:bold; margin-bottom:8px; color:#8e44ad;">Flange Touch Point (High Point)</div>
*'''Rotational error''' is where a flange's bolt holes are not oriented as intended.
<div style="margin-bottom:10px; text-align:left;">Indicates the exact point on the flange face that contacts the mating flange first. The correction value indicates the required pullback distance into the pipe run.</div>
[[File:PDF Link VEGR 02.png|center|300px]]
</div>


==Errors and Fit==
<div style="flex:1 1 45%; min-width:300px; padding:16px 20px; border:1px solid rgba(128,128,128,0.35); border-top:4px solid #9b59b6; border-radius:6px; background:#ffffff; text-align:center;">
When the fabricated pipe spool exactly matches the design, all vector arrow values will be zero. Otherwise, the arrows show the measured error in your selected units and in a particular vector direction. The below flange was measured 1.4 mm too high, 0.6 mm too far north and 0.8 mm too far east. Fixing these errors means moving the flange in the opposite direction to the arrows by the stated amount.
<div style="font-weight:bold; margin-bottom:8px; color:#8e44ad;">Open Pipe End Long Point</div>
<div style="margin-bottom:10px; text-align:left;">Identifies the long point location along un-flanged pipe ends (PE) to guide field bevel trimming.</div>
[[File:PDF Link VEGR 06.png|center|300px]]
</div>


<gallery mode ="packed" heights= 500px>
</div>
PDF Link VEGR 01.png
</gallery>


==Bolt Hole Rotation==
=== Final report and analysis controls ===
The blue arrow shows the rotational error in mm and the direction of the error.
<div style="margin:16px 0 20px 0; padding:16px 20px; border:1px solid rgba(128,128,128,0.35); border-top:4px solid #9b59b6; border-radius:6px; background:#ffffff; text-align:center;">
<div style="font-weight:bold; font-size:110%; margin-bottom:8px; color:#8e44ad;">Full 3D Graphical Analysis Report</div>
[[File:PDF Link VEGR 04.png|center|550px]]
</div>


<gallery mode ="packed" heights= 500px>
<div style="margin:16px 0; padding:14px 18px; border:1px solid rgba(128,128,128,0.3); border-left:4px solid #9b59b6; border-radius:4px; background:rgba(155,89,182,0.04);">
PDF Link VEGR 03.png
<div style="font-weight:bold; font-size:105%; margin-bottom:4px; color:#333;">Analysis controls and viewing options</div>
</gallery>
<b>Video guide:</b> [https://www.youtube.com/watch?v=M0EKY7FRpMs Analysis View Controls and Model Navigation][cite: 1]
 
<br><br>
==Touch Point==
<i>Summary:</i> Explains model rotation, vector arrow scaling, toggling point spheres, adjusting font sizes, setting vector tolerance thresholds, and launching PDF previews[cite: 1].
The adjoining flange will touch here first - this is the high point. Move the flange back towards the pipe, by the stated amount to fix the error.
</div>
 
<gallery mode ="packed" heights= 500px>
PDF Link VEGR 02.png
</gallery>
 
==Open Pipe Ends Touch Point==
The adjoining pipe will touch here first – this is the long point.
 
<gallery mode ="packed" heights= 500px>
PDF Link VEGR 06.png
</gallery>
 
==Final Report==
 
<gallery mode ="packed" heights= 1000px>
PDF Link VEGR 04.png
</gallery>


==Analysis Tools==
<div style="display:flex; flex-wrap:wrap; gap:16px; margin:16px 0 20px 0;">
For a video on the analysis controls, head [https://www.youtube.com/watch?v=M0EKY7FRpMs| here.]


[[File:Analaysis Controls01.png|1200px|Visual Report Details]]
<div style="flex:1 1 45%; min-width:350px; padding:16px 20px; border:1px solid rgba(128,128,128,0.35); border-top:4px solid #9b59b6; border-radius:6px; background:#ffffff; text-align:center;">
<div style="font-weight:bold; font-size:110%; margin-bottom:8px; color:#8e44ad;">Analysis View Controls Interface</div>
[[File:Analaysis Controls01.png|center|650px]]
</div>


==PDF Preview==
<div style="flex:1 1 45%; min-width:350px; padding:16px 20px; border:1px solid rgba(128,128,128,0.35); border-top:4px solid #9b59b6; border-radius:6px; background:#ffffff; text-align:center;">
You can create a PDF of your report to provide to other members of your team or clients by selecting the PDF preview button.
<div style="font-weight:bold; font-size:110%; margin-bottom:8px; color:#8e44ad;">PDF Report Export Preview Window</div>
[[File:4PXUpdate.png|center|650px]]
</div>


[[File:4PXUpdate.png|1200px|PDF Preview]]
</div>

Latest revision as of 15:06, 28 October 2026

automet® for Fabricators
Three core steps: Design Input, Field/Shop Survey, and Analysis. Follow this workflow in order to inspect, verify, and correct pipe spools during fabrication.

1 · Design Input
Import or manually construct the baseline spool model (.DES).

2 · Survey Execution
Observe physical flanges, supports, and pipe ends against the design.

3 · Analysis & Report
Evaluate vector deviations, alignment touch points, and export reports.

Before starting the survey:

Power on the Total Station and establish a connection to your laptop via Bluetooth or Leica GEV267 serial cable.

Video guide: Getting Started & Hardware Setup

Step 1: Design Input

automet® FAB requires a baseline design file (`.DES`) to compare measured survey points against drawing specifications.

Method 1 · Import IDF or PCF File

The fastest method. Import an exported plant design file (IDF or PCF) directly into automet® FAB. The system automatically populates component specifications, flange ratings, and segment lengths into a `.DES` file.


Video guide: Import IDF/PCF Files into automet®

Method 2 · Manual Design Entry

Build or edit the model manually using the Design Input module. Mastering manual entry is essential for updating client isometric drawings, editing gasket allowances, and modifying component lengths in the field.


Video guide: Manual Design Entry Video Playlist

Step 2: Survey Execution

Once a design model (`.DES`) is loaded, you are ready to execute the survey.

Starting a survey session

Select the Run Survey button on the main menu.

Start New Survey

Select START NEW to generate a new survey file using the design name, automatically assigning the survey stage and revision number.

Continue Existing Survey

Select CONTINUE EXISTING to reload previous observations. This function requires that neither the spool nor total station has moved, or that control points are available for resection.

Load design file and survey stage

1. Select the target design file using the file browser button (`...`). 2. Choose the appropriate survey stage:

    • In-Situ: Field measurements on installed piping networks prior to replacement.
    • Tack Weld: Fabrication shop survey during pre-weld assembly.
    • Post Weld: Final quality verification following full weld completion.

Pre-survey preparation checklist

Before selecting Start Capture:

1. Verify isometric geometry: Click the Isometric button to confirm the active model matches the physical spool. Flange numbers on the drawing must correspond directly to survey sequence order. 2. Physical flange marking: Mark corresponding flange numbers directly onto physical flanges using paint markers. 3. Targeting telescope start point: Aim the telescope at a accessible starting point on Flange 01. Hold the right mouse button to guide the motor laser. If target lock is lost, return the prism to the starting point to recover lock. 4. Plan measurement path: Select an initial diameter point and proceed sequentially around the flange face in one continuous direction.

Moving survey start points

Video guide: Moving the Start Point During a Survey (0:55)

Summary: Useful technique when surveying large spools with restricted line-of-sight.

Orientation Point (OP) for straight spools

An Orientation Point (OP) establishes Top Dead Centre (TDC) for straight pipe spools lacking distinguishing geometric features.

1. Record a single point at the top center of Flange 01, positioned at Top Dead Centre between the upper bolt holes. 2. Proceed with the flange survey as normal. 3. Mark the physical OP location on the spool body to ensure correct site installation orientation.

Orientation Point workflow

Video guide: Orientation Point Procedure for Straight Spools (2:56)

Flange and support observations

Video guides:

Step 3: Analysis and Deviation Verification

The analysis module compares captured survey coordinates against design geometry to calculate dimensional deviations.

Key Analytical Definitions
  • Vector error: Coordinate distance (X, Y, Z) between measured work points and design centerlines.
  • Alignment error (Touch Point): High-point location on a flange face that will make contact first with a mating flange. The displayed value represents the gap opening (in mm) on the opposite side of the face.
  • Rotational error: Angular rotation error of bolt-hole patterns relative to design reference axes.

Interpreting deviation reports

Positional Vector Errors
Vector arrows indicate the magnitude and direction of displacement.



Example: A flange reading +1.4 mm Z, +0.6 mm Y (North), and +0.8 mm X (East) requires physical adjustment in the opposite direction (-1.4 mm Z, -0.6 mm South, -0.8 mm West) to achieve zero deviation.
Bolt-Hole Rotational Error
The blue curved arrow indicates rotational displacement (in mm or degrees) and direction of bolt-hole misalignment.
Flange Touch Point (High Point)
Indicates the exact point on the flange face that contacts the mating flange first. The correction value indicates the required pullback distance into the pipe run.
Open Pipe End Long Point
Identifies the long point location along un-flanged pipe ends (PE) to guide field bevel trimming.

Final report and analysis controls

Full 3D Graphical Analysis Report
Analysis controls and viewing options

Video guide: Analysis View Controls and Model Navigation[cite: 1]

Summary: Explains model rotation, vector arrow scaling, toggling point spheres, adjusting font sizes, setting vector tolerance thresholds, and launching PDF previews[cite: 1].

Analysis View Controls Interface
PDF Report Export Preview Window