==Site Survey Overview==
__NOTOC__
When a replacement pipe spool or spools are required, a pipework site survey should be performed. The survey should document critical aspects of the spool as well as items in close proximity to it.
<!-- ===================== HEADER ===================== -->
<div style="margin:0 0 15px 0; padding:18px 22px; border:1px solid rgba(128,128,128,0.35); border-left:5px solid #3366cc; border-radius:6px; background:rgba(51,102,204,0.06);">
<div style="font-size:170%; font-weight:bold; margin-bottom:4px;">Site (In-Situ) Pipe Spool Survey</div>
<div style="margin-bottom:8px;">Capturing as-built spool geometry, instrument moves, and field control points in automet® FAB.</div>
<div style="font-size:90%;">[[Main Page|← Main Page]] &nbsp;·&nbsp; [[Automet® FAB - General Survey Concept|← Data Capture]]</div>
</div>


Control points can be measured as shown below.
== Overview ==


<gallery mode = "packed" heights = 300 px>
A site survey determines the precise spatial geometry and specification of an installed pipe spool, existing tie-in connections, and adjacent structural clearance points.
File:Survey Capture.gif
</gallery>


This video provides details of the general site survey capture process.
== Instrument Relocation and Control Points ==


<gallery mode = "packed" widths = 300 px>
When surveying complex or extended pipework, multiple instrument setups may be required.
File:site-survey-overview.webp
 
</gallery>
* '''Automated setup registration:''' [[Automet® FAB - Control Capture Methods|Control points]] allow the total station to be relocated around the work area while automatically registering each setup into a single, unified survey dataset.
* '''Real-time validation:''' The **move function** verifies whether relative setup positions are valid and mathematically consistent in real time as you capture observations.
* '''Quality assurance:''' Alignment accuracy between instrument setups is calculated and documented within the generated quality assurance (QA) report.
 
<div style="text-align:center; margin:16px auto 24px auto;">
[[File:Survey Capture.gif|center|650px]]
<div style="margin-top:6px; font-size:85%; font-weight:bold;">Real-time instrument setup registration using control points</div>
</div>
 
== Video Tutorial ==
 
<div style="background-color: #f8f9fa; border: 1px solid rgba(128,128,128,0.3); border-left: 5px solid #3366cc; padding: 16px; margin: 20px 0; border-radius: 6px; display: flex; align-items: flex-start; gap: 14px;">
<div style="font-size: 22px; line-height: 1.2;">🎬</div>
<div style="display: flex; flex-direction: column; gap: 10px; align-items: flex-start;">
<div>'''Video tutorial:''' Demonstrates the general site survey capture process, using preliminary designs and multiple instrument setups to capture tie-in flanges and supports: <span style="color: #666; font-size: 90%;">(1:11 mins)</span></div>
<span class="plainlinks">[https://www.youtube.com/watch?v=QWWvB3CAQTc <span class="mw-ui-button mw-ui-progressive" style="margin: 0; padding: 6px 12px; font-weight: bold; color: white !important; text-decoration: none !important;">▶ Watch video</span>]</span>
</div>
</div>
 
== Related Topics ==
 
* [[Automet® FAB - In-Situ Survey|Survey stage in-situ]]
* [[Automet® FAB - Site (In-Situ) Flange Survey|Site (in-situ) flange survey]]
* [[Automet® FAB - Open Tie-In - Tie-In - Closing Spool Survey|Open tie-in survey]]

Latest revision as of 11:36, 7 October 2026

Site (In-Situ) Pipe Spool Survey
Capturing as-built spool geometry, instrument moves, and field control points in automet® FAB.

Overview

A site survey determines the precise spatial geometry and specification of an installed pipe spool, existing tie-in connections, and adjacent structural clearance points.

Instrument Relocation and Control Points

When surveying complex or extended pipework, multiple instrument setups may be required.

  • Automated setup registration: Control points allow the total station to be relocated around the work area while automatically registering each setup into a single, unified survey dataset.
  • Real-time validation: The **move function** verifies whether relative setup positions are valid and mathematically consistent in real time as you capture observations.
  • Quality assurance: Alignment accuracy between instrument setups is calculated and documented within the generated quality assurance (QA) report.
Real-time instrument setup registration using control points

Video Tutorial

🎬
Video tutorial: Demonstrates the general site survey capture process, using preliminary designs and multiple instrument setups to capture tie-in flanges and supports: (1:11 mins)

▶ Watch video