Automet® FAB - Site Survey: Difference between revisions
| Line 1: | Line 1: | ||
==Site Survey Overview== | ==Site Survey Overview== | ||
When a replacement pipe spool | When a replacement pipe spool is required, a pipework site survey should be performed. The survey should capture critical aspects of the spool as well as items in close proximity to it. | ||
The control points as illustrated below, my be required. The system uses the control points to enable the movement of the survey instrument, automatically registering the setups as you go, culminating in a single survey file which includes all of the setups combined. The Quality Assurance (QA) report will demonstrate the quality and accuracy of the setup registration. The move function determines whether the setups are valid and fit together in real time while you work. | |||
<gallery mode = "packed" heights = 600 px> | <gallery mode = "packed" heights = 600 px> | ||
Revision as of 09:57, 9 February 2024
Site Survey Overview
When a replacement pipe spool is required, a pipework site survey should be performed. The survey should capture critical aspects of the spool as well as items in close proximity to it.
The control points as illustrated below, my be required. The system uses the control points to enable the movement of the survey instrument, automatically registering the setups as you go, culminating in a single survey file which includes all of the setups combined. The Quality Assurance (QA) report will demonstrate the quality and accuracy of the setup registration. The move function determines whether the setups are valid and fit together in real time while you work.
This video Site Survey Overview video provides details of the general site survey capture process.
