Automet® FAB - Site Survey: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 11: | Line 11: | ||
<gallery mode = "packed" widths = 300 px> | <gallery mode = "packed" widths = 300 px> | ||
File: | File:Survey Capture.ogg | ||
</gallery> | </gallery> | ||
Revision as of 10:39, 12 October 2023
Site Survey Overview
When a replacement pipe spool or spools are required, a pipework site survey should be performed. The survey should document critical aspects of the spool as well as items in close proximity to it.
Control points can be measured as shown below.
This video provides details of the general site survey capture process.