Automet® FAB - Site Survey: Difference between revisions

From ML Tech Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 12: Line 12:
<div style="font-size: 20px; line-height: 1.2;">🎬</div>
<div style="font-size: 20px; line-height: 1.2;">🎬</div>
<div style="display: flex; flex-direction: column; gap: 10px; align-items: flex-start;">
<div style="display: flex; flex-direction: column; gap: 10px; align-items: flex-start;">
<div>'''Video Tutorial:''' This provides details of the general site survey capture process. <span style="color: #666; font-size: 90%;">(5:33 mins)</span></div>
<div>'''Video Tutorial:''' This provides details of the general site survey capture process. <span style="color: #666; font-size: 90%;">(1:11 mins)</span></div>
<span class="plainlinks">[https://www.youtube.com/watch?v=QWWvB3CAQTc <span class="mw-ui-button mw-ui-progressive" style="margin: 0; padding: 6px 12px; font-weight: bold; color: white !important; text-decoration: none !important;">▶ Watch Video</span>]</span>
<span class="plainlinks">[https://www.youtube.com/watch?v=QWWvB3CAQTc <span class="mw-ui-button mw-ui-progressive" style="margin: 0; padding: 6px 12px; font-weight: bold; color: white !important; text-decoration: none !important;">▶ Watch Video</span>]</span>
</div>
</div>

Revision as of 13:28, 24 June 2026

The pipe spool site survey is intended to determine the geometry and specification of the spool and in some cases the geometry of nearby items.

The control points, as illustrated below, my be required during a site survey. The system uses the control points to enable the movement of the survey instrument, automatically registering the setups as you go, culminating in a single survey file which includes all of the setups combined. The Quality Assurance (QA) report will demonstrate the quality and accuracy of the setup registration. The move function determines whether the setups are valid and fit together in real time while you work.


🎬
Video Tutorial: This provides details of the general site survey capture process. (1:11 mins)

▶ Watch Video

Site (In-Situ) Pipe Spool Survey