Automet® FAB - Start New Survey

From ML Tech Wiki
Revision as of 08:55, 7 October 2026 by Tristan (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Survey Type: Start New or Continue Existing
Choosing between initiating a new survey or continuing an existing routine in automet® FAB.

Start New

Selecting Start new generates a survey file using the name of the active design file, appending the specified survey stage and revision number.

Start new survey button selection

Continue Existing

If a survey is incomplete or requires additional data capture, select Continue existing to reload all previously recorded observations. For this option to remain valid, neither the pipe spool nor the instrument must have moved, or the survey file must contain control points that can be remeasured.

Continue existing survey button selection

Applications for Continuing an Existing Survey

Power interruption during capture

If power to the instrument or laptop is interrupted, select Continue existing to return directly to the previous step in the capture routine without data loss. To confirm system stability, measure a known point (such as a bolt hole) using the Point option and compare new coordinates against recorded data.

Working with multiple spools

Using Continue existing allows operators to load an active survey and resume data collection without surveying the entire spool again. Any saved survey file can be reloaded, provided the spool and instrument positions remain unchanged.

Repositioning spool components

When moving or adjusting a spool component, loading the existing survey routine allows previously captured data for that specific item to be deleted and resurveyed. This process can be repeated as needed, provided the main spool body and instrument setup remain undisturbed.

Spools with established control points

When control points have been established on a spool or vessel, selecting Continue existing loads the file containing those reference points. The automet® FAB software appends new measurement data directly to the active file. Because control points are anchored to the structure, the spool or vessel can be moved between survey sessions.

Survey files with external control points

When a survey file contains control points within the surrounding work area, use Continue existing to resume operations. Before recording additional features, the automet® FAB software prompts the user to measure a minimum of four control points to re-establish spatial alignment.